24 hours Consulting Hotline :

13707380851

ContactCONTACT US

Consulting Hotline:

137-0738-0851

Sino-Expansion Co, Ltd
Phone:0086-738-8261060    
Mobile:0086-13707380851
Fax:0086-738-8261062    
Email:lsj988@188.com
Add:SHIMA ROAD,LOUXING DISTRICT,LOUDI,HUNAN PROVINCE,P.R.CHINA 417000
mixing and fillin...
current location : Home > usage > mixing and fillin...
  PREPARATION:

  Demolition agent;

  Clean and cold water;

  Plastic or metal bucket;

  Beater or wooden rod for mixing;

  Safety goggles;

  Rubber gloves;

  Dust-proof mask(required)

  Helmet(required)

  Thermometer(required)

  Cap(wooden or iron wedge)    


  Mixing

  1.For regular safety reasons and mixing small amounts by hand, it is recommended to use rubber gloves.

  2.In a bucket, combine 1.5 Liters of water to one 5kgs bag of CRACKAG. Or pour water and CRACKAG as a rate of 1:3 units by weight.

  3.Mix well, using a drill and paddle is recommended. If mixing with a stick or other method, make sure powder is completely dissolved into the water. Mix to a slurry.

  Filling

  1.Clean holes before filling using air hose remove excess dust from drilling.

  2.CRACKAG slurry should be poured into holes within 10-15 min. after mixing. Do not fill to the top, only fill the holes about 15mm ( ½” to 1”) from the top.

  3.Mix well and pour into holes while agitating the hole to make sure no air gaps are in the hole. Example: Using a piece of rod or stick to poke holes.

  4.For Horizontal holes, a grouting pump would be most reliable to poor.



Consulting Hotline:

13707380851